262
Nynja Build manual 1.0
longitudinal tubes
tu2
, 54
longitudinal tubes
tu4
, 54
lower cabin triangle tubes
tu12
, 25
magneto, 186
main undercarriage cross-beam
tu9
,
25
master switch, 187
modifications, 13
oil tank, 160
open door keeper, 205, 216
part numbering, 17
penny washers, 107
pitch, 250
Pitot, 181
pulleys, 91, 122
pushrods, 76
rear cabin frame cross-tube
tu40
, 36
rear cabin frame diagonals
tu27
, 34
rear cabin uprights
tu6
, 33
rear cable bracket, 82
Rear Fuselage,
54
regulator, 189
restrictor, 168
Rotax 912, 37, 105, 182
rubber washers, 73
rubbing cables, 98
rudder, 89
rudder cables, 94
rudder centring bungee, 94
rudder horn, 87
rudder pedals, 48, 76
rudder pedals position, 95
rudder post, 54
rudder stops, 51, 96
seat front support tube
tu15
, 46
seatbelts, 230
seats, 227
self-adhesive foam strip, 190
Skyranger Hotline
,
11
solenoid, 189
spacer tube
tu102
, 75
spats, 70, 73, 231
stainless-steel
lower
triangulation
tubes
tu23
, 43
stainless-steel
upper
triangulation
tubes
tu24
, 40
steel diagonal brace
tu310
, 41
steel diagonal-brace
tu43
, 49
steel diagonal-brace
tu43
, 29
steel T-piece, 54
steel under-seat diagonal tubes
tu42
,
46
steering, 75
stiff, 120
stop-rings, 94
stub axle, 70
sump, 162
tail surfaces, 80
tailplane, 63
tank securing straps, 170
tension, 248
tensioning, 80
throttle friction, 146
throttles, 143
tightening bolts, 52
torque, 108, 165
torque-tube bearing, 50
T-piece, 167
trailing edge tube
tu50
, 110
trim lever, 220
trim tab horns, 82
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...