152
f) Move now to the top edge of the firewall. This is fixed to the upper forward
edge of the scuttle.
The outer edges will need bending downwards in a slight
curve to match the curve of the moulding. This can be done with some light
hand pressure. The aluminium will also need triming to match the edge of the
moulding. When happy with the fit fix using 3mm countersunk rivets. Use just
two for now 50mm either side of the dead centre. The rest will be fitted when
the exact position of the cowling screws are determined to ensure even
spacing.
g) Dont trim or fix the scuttle to the door pillars just yet as some final adjustment
will be required to ensure perfect alignment of cowlings and spinner,. Hold it in
position for now with some tape and clamps in the position shown below
Figure 186 scuttle positioning
– dont trim overlap yet, and clamp in position with upper edge
500mm from top of door pillar tube (TU34).
h) The small closure panels can be rivetted in position now or left until engine
ancillaries are all fitted
– dont forget them!
Figure 187 firewall closure panels
– dont forget them!
Summary of Contents for Nynja Build
Page 1: ...1 Nynja Build manual Version 1 0...
Page 2: ...2 Figure 1 tube numbering scheme...
Page 3: ...3 Figure 2 Basic frame Skyranger...
Page 4: ...4 Figure 3 uncovered Skyranger frame...
Page 5: ...5 Figure 4 Uncovered Nynja frame Figure 5 Nynja fuselage with rear fairings removed...
Page 6: ...6 Figure 6 Nynja fuselage with rear fairings removed rear view Figure 7 simply assemble thus...
Page 22: ...22 Figure 13 forward fuselage from front quarter Figure 14 Cabin upper rear corner...
Page 60: ...60 Figures 65 cable arrangement further overview...
Page 86: ...86 Figure 100 Nynja elevator joiner with integral control horn...
Page 113: ...113 Figure 135 front jury strut attachment Figure 136 rear jury strut attachment...
Page 183: ...183 Figure 231 heavy duty power wiring schematic Rotax 912...
Page 184: ...184 Figure 232 low current wiring schematic Rotax 912...
Page 185: ...185 Figure 233 instrument wiring schematic Rotax 912...
Page 200: ...200 Nynja Build manual 1 0 18 2 One Piece Door Figure 250 one piece door frame...
Page 256: ...256 Nynja Build manual 1 0...
Page 257: ...257 Nynja Build manual 1 0 27 2 Wire locking...
Page 258: ...258 Nynja Build manual 1 0...
Page 259: ...259 Nynja Build manual 1 0...
Page 260: ...260 Nynja Build manual 1 0...
Page 265: ...265 Nynja Build manual 1 0...