
OF-500 OptiFiber Certifying OTDR
Technical Reference Handbook
2-12
Step 2: Setting Up a Job Folder
You can organize test results on the memory card by
setting up a folder for each job, as follows:
2-1
Insert a formatted memory card into the tester.
2-2
Press
S
; then select
CURRENT FOLDER
on the
Job
tab.
2-3
Press
A
New Folder
.
Use the softkeys,
K
NML
,
and
t
to enter a folder name into the
NEW
FOLDER NAME
box. Figure
2-1
describes the text
editing screen.
Press
s
when you are finished.
2-4
Press
t
to select the new folder as the current
folder.
Step 3: Entering the Operator Name
For this tutorial you will enter your name as the operator.
3-1
Press
S
; then select
OPERATOR
on the
Job
tab.
3-2
Use the softkeys,
K
NML
, and
t
to enter your
name into the
OPERATOR
box. Press
s
when
you are finished.
Step 4: Identifying the Cabling Ends
For the OTDR and Loss/Length testing tutorials in this
chapter, you will save test results from both ends of the
cabling. To identify the test directions in the saved
results, enter
END
information on the
Job
tab as follows:
4-1
On the
Job
tab select
END 1
. Use the softkeys,
K
NML
, and
t
to enter CLOSET into the
END 1
box. Press
s
when you are finished.
4-2
On the
Job
tab select
END 2
. Use the softkeys,
K
N
ML
, and
t
to enter WORK AREA into the
END
2
box. Press
s
when you are finished.
4-3
On the
Job
tab, verify that
THIS END
is set to
END 1
.
Change it to
END 1
if necessary.
Step 5: Setting the Save Warning
If you do not save a test, it is deleted from temporary
memory when you run another test. To enable or disable
a warning that reminds you to save the test, do the
following:
5-1
On the
System
tab, select
SAVE WARNING
.
5-2
Use
LM
to highlight
Enabled
or
Disabled
; then
press
t
.
Summary of Contents for OF-500 OptiFiber
Page 12: ...OF 500 OptiFiber Technical Reference Handbook x ...
Page 18: ...OF 500 OptiFiber Technical Reference Handbook xvi ...
Page 27: ...Getting Acquainted Powering the Tester 1 1 9 ajt20f eps Figure 1 1 Battery Pack Features ...
Page 29: ...Getting Acquainted Verifying Operation 1 1 11 ajt56f eps Figure 1 2 Removing the Module ...
Page 46: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 1 28 ...
Page 136: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 4 6 ...
Page 192: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 6 48 ...
Page 254: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 11 36 ...
Page 256: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook ...
Page 272: ...B 14 OF 500 OptiFiber Certifying OTDR Technical Reference Handbook ...
Page 274: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook C 2 ...
Page 282: ...OF 500 OptiFiber Technical Reference Handbook 8 ...