
Getting Started Testing Fiber
Tutorial: Preparing to Save Tests
2
2-11
Tutorial: Preparing to Save Tests
The tutorial in this section guides you through setting up
the tester to save tests.
Step 1: Creating a List of Sequential Fiber IDs
This step assumes the following scenario:
•
You will be testing 12 cables in two patch panels:
cables 1 through 6 in panel A and cables 1 through 6
in panel B.
•
Both panels are located in telecommunications closet
A on the third floor of the building.
•
Your fiber IDs will follow the ANSI/TIA/EIA-606-A
standard for horizontal links. See “About
ANSI/TIA/EIA-606-A Fiber IDs” on page 2- 25 for
details.
1-1
Press
S
; then select
AUTO SEQ TEMPLATE
on
the
Job
tab.
1-2
On the
AUTO SEQUENCE
screen, press
A
Change
Template
; then select
Horizontal
.
1-3
On the
AUTO SEQUENCE
screen press
D
Default
to
transfer the default pattern into the
START ID
and
STOP ID
.
1-4
On the
AUTO SEQUENCE
screen press
B
Edit Start
.
Use the softkeys,
K
N
ML
, and
t
to change
the default ID to 03A-A01 in the
CURRENT START ID
box. Press
s
when you are finished.
1-5
On the
AUTO SEQUENCE
screen press
C
Edit Stop
.
Use the softkeys and
K
NML
to change the
default ID to 03A-B06 in the
CURRENT START ID
box.
Press
s
when you are finished.
1-6
Press
E
Sample List
. You should see a list of 12
sequential fiber IDs: 03A-A01 through 03A-B06. If
the tester beeps instead of showing the list, see
“Solving Problems with Fiber ID Lists” on page 2-27.
1-7
Press
e
to leave the sample list.
1-8
Press
s
when you are finished setting up the list.
The list is saved in the mainframe (not on the
memory card or in the module).
Summary of Contents for OF-500 OptiFiber
Page 12: ...OF 500 OptiFiber Technical Reference Handbook x ...
Page 18: ...OF 500 OptiFiber Technical Reference Handbook xvi ...
Page 27: ...Getting Acquainted Powering the Tester 1 1 9 ajt20f eps Figure 1 1 Battery Pack Features ...
Page 29: ...Getting Acquainted Verifying Operation 1 1 11 ajt56f eps Figure 1 2 Removing the Module ...
Page 46: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 1 28 ...
Page 136: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 4 6 ...
Page 192: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 6 48 ...
Page 254: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook 11 36 ...
Page 256: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook ...
Page 272: ...B 14 OF 500 OptiFiber Certifying OTDR Technical Reference Handbook ...
Page 274: ...OF 500 OptiFiber Certifying OTDR Technical Reference Handbook C 2 ...
Page 282: ...OF 500 OptiFiber Technical Reference Handbook 8 ...