2. Commissioning
2−3
Festo P.BE−CPX−FB23−EN en 0308NH
Contents of this chapter
In this chapter you will find information on commissioning the
CPX terminal on the field bus CC−Link.
CPX terminal configuration and addressing
Bus configuration and addressing on the field bus CC−Link
You can adapt the reaction of the CPX terminal to the rel
evant requirements by parametrizing it with the handheld.
This enables e.g. the setting of debounce times or signal
lengthening.
Further information
Before commissioning you must install the CPX terminal
correctly. Information on this can be found in chapter 1.
General information on commissioning CPX terminals as well
as a detailed description of the individual parameters can be
found in the CPX system manual (P.BE−CPX−SYS−..).
Information on commissioning the pneumatic interface and
I/O modules can be found in the manual for the CPX I/O
modules (P.BE−CPX−EA−..).
Instructions on commissioning the pneumatics can be found
in the relevant pneumatics manual.
Summary of Contents for CPX-FB23
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPX FB23 EN en 0308NH...
Page 15: ...Installation 1 1 Festo P BE CPX FB23 EN en 0308NH Chapter 1...
Page 45: ...Commissioning 2 1 Festo P BE CPX FB23 EN en 0308NH Chapter 2...
Page 86: ...2 Commissioning 2 42 Festo P BE CPX FB23 EN en 0308NH...
Page 87: ...Diagnosis and error treatment 3 1 Festo P BE CPX FB23 EN en 0308NH Chapter 3...
Page 104: ...3 Diagnosis and error treatment 3 18 Festo P BE CPX FB23 EN en 0308NH...
Page 105: ...Technical appendix A 1 Festo P BE CPX FB23 EN en 0308NH Appendix A...
Page 117: ...Index B 1 Festo P BE CPX FB23 EN en 0308NH Appendix B...
Page 118: ...B Index B 2 Festo P BE CPX FB23 EN en 0308NH Contents B Index B 1 B 1 Index B 3...