1. Installation
1−23
Festo P.BE−CPX−FB23−EN en 0308NH
1.3.3
Pin assignment of field bus interface
Bus connection
Socket
Pin
CC−Link
Designation
1
2
3
4
5
6
7
8
9
Housing
n.c.
DA
DG
n.c.
n.c.
1)
n.c.
DB
n.c.
n.c.
SLD / FG
Not connected
Data A
Data reference potential (data
ground)
Not connected
FE via R/C combination
1)
Not connected
Data B
Not connected
Not connected
Cable screening/shield, connection
to FE of the CPX terminal
1)
Not used with CC−Link: Connection via R/C combination FE of the
CPX terminal
Tab.1/13:
Pin assignment of bus connection
Summary of Contents for CPX-FB23
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPX FB23 EN en 0308NH...
Page 15: ...Installation 1 1 Festo P BE CPX FB23 EN en 0308NH Chapter 1...
Page 45: ...Commissioning 2 1 Festo P BE CPX FB23 EN en 0308NH Chapter 2...
Page 86: ...2 Commissioning 2 42 Festo P BE CPX FB23 EN en 0308NH...
Page 87: ...Diagnosis and error treatment 3 1 Festo P BE CPX FB23 EN en 0308NH Chapter 3...
Page 104: ...3 Diagnosis and error treatment 3 18 Festo P BE CPX FB23 EN en 0308NH...
Page 105: ...Technical appendix A 1 Festo P BE CPX FB23 EN en 0308NH Appendix A...
Page 117: ...Index B 1 Festo P BE CPX FB23 EN en 0308NH Appendix B...
Page 118: ...B Index B 2 Festo P BE CPX FB23 EN en 0308NH Contents B Index B 1 B 1 Index B 3...