1. Installation
1−16
Festo P.BE−CPX−FB23−EN en 0308NH
With the operating mode Remote Controller" both switches
of the 2−element DIL switch 4 must be set to OFF. 8 I/O bytes
are intended for communication between the field bus node
and an integrated FEC (in preparation).
Further information on the number of stations per slave can
be found in section 2.1.
Please note
Depending on the number of stations set per slave, subse
quent slave addresses are also assigned.
CC−Link slave addresses may only be assigned once per
field bus line.
Example: slave address = 2 / number of stations = 3
slave address = 3 / number of stations = 1
Address
Assignment
1
2
3
4
5
6
...
...
Station 1 / Slave 2
Station 2 / Slave 2
Station 3 / Slave 2
Station 1 / Slave 3
...
Tab.1/8:
Example of slave addresses and number of
stations (see also Fig.2/16)
Observe the general rules on addressing in the manual for
your CC−Link master.
Summary of Contents for CPX-FB23
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPX FB23 EN en 0308NH...
Page 15: ...Installation 1 1 Festo P BE CPX FB23 EN en 0308NH Chapter 1...
Page 45: ...Commissioning 2 1 Festo P BE CPX FB23 EN en 0308NH Chapter 2...
Page 86: ...2 Commissioning 2 42 Festo P BE CPX FB23 EN en 0308NH...
Page 87: ...Diagnosis and error treatment 3 1 Festo P BE CPX FB23 EN en 0308NH Chapter 3...
Page 104: ...3 Diagnosis and error treatment 3 18 Festo P BE CPX FB23 EN en 0308NH...
Page 105: ...Technical appendix A 1 Festo P BE CPX FB23 EN en 0308NH Appendix A...
Page 117: ...Index B 1 Festo P BE CPX FB23 EN en 0308NH Appendix B...
Page 118: ...B Index B 2 Festo P BE CPX FB23 EN en 0308NH Contents B Index B 1 B 1 Index B 3...