5. Diagnostics and error handling
5−10
Festo P.BE−CPX−CMA X−SYS−EN en 0908NH
Malfunction group 1 Execution error
CPX error group 101
(CPX−MMI: [Execution error])
No.
Message
Cause/description
Error handling
Type
1)
10
Homing not executed
Drive with incremental dis
placement encoder is not
referenced.
·
Carry out homing.
Error
level: F1
Reset: R
11
Homing not required
Homing for absolute dis
placement encoder.
·
Carry out homing.
Error
level: F1
Reset: R
13
Incorrect direction of
movement during move
ment test
Cylinder and valve have in
correct tubing connections.
·
Check the tubing connec
tions and, if necessary,
replace at the cylinder or
valve.
Error
level: F2
Reset: R
14
Movement test not
executed.
Positioning job without
valid movement test.
·
Carry out movement test
(recommended) or skip.
Error
level: F2
Reset: R
15
Result of movement test
is ambiguous
Drive stuck.
·
Check the friction of the
drive and guide and, if
necessary, check the pres
sure build−up with trace.
Error
level: F1
Reset: R
Obstacle in the travel path.
·
Check the travel path and
software end positions.
Working pressure insuffi
cient to move the mass.
·
Set sufficient working
pressure and check the
configuration of the mass.
Cylinder not correctly
engineered.
·
Check size and, if
necessary, correct.
Valve defective.
·
Check pressure build−up
with trace, and exchange
valve, if necessary.
Tubing connection defec
tive.
·
Check the tubing connec
tion.
Valves (emergency stop) in
stalled between the valve
and cylinder are closed.
·
Open valves.
1)
For the error level and reset type, see section 5.2.3.
Summary of Contents for CPX-CMAX-C1-1
Page 2: ......
Page 22: ...Contents and general safety instructions XX Festo P BE CPX CMAX SYS EN en 0908NH...
Page 23: ...CMAX system overview 1 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 1...
Page 31: ...Fitting and pneumatic installation 2 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 2...
Page 60: ...2 Fitting and pneumatic installation 2 30 Festo P BE CPX CMAX SYS EN en 0908NH...
Page 61: ...Electrical installation 3 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 3...
Page 79: ...Commissioning 4 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 4...
Page 122: ...4 Commissioning 4 44 Festo P BE CPX CMAX SYS EN en 0908NH...
Page 123: ...Diagnostics and error handling 5 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 5...
Page 163: ...Technical appendix A 1 Festo P BE CPX CMAX SYS EN en 0908NH Appendix A...
Page 176: ...A Technical appendix A 14 Festo P BE CPX CMAX SYS EN en 0908NH...