11 Material calculation
137
11 Material calculation
General
Material calculation is the last menu in the view menu.
The call-up and structure of the menu sequences are already described
in detail in point "8.7 View menu".
Function
The material calculation menu offers you a choice of the following two
functions:
Calculating the applied material
This calculates and displays the total applied material from a start-
ing point that you have to enter.
Advance material planning (calculation)
This function calculates the total amount of material still required
up to a point in time that you have to enter.
11.1 Calculating the applied material
Use the up/down buttons to calculate the quantity of
material already applied.