![Epson LS10-B User Manual Download Page 142](http://html.mh-extra.com/html/epson/ls10-b/ls10-b_user-manual_110798142.webp)
Maintenance 8. Joint #4
130
LS10-B Rev.6
(4) Loosely secure the Joint #4 motor unit to
Arm #2.
Make sure the motor unit can be moved by
hand, and it will not tilt when pulled.
If the unit is secured too loose or too tight,
the belt will not have the proper tension.
Joint #4
Motor Unit
3-M4
×
12
+
Washer
(5) Apply the proper tension to the U1 belt,
and then secure the Joint #4 intermediate
shaft unit.
Pass a suitable cord or string around the
Joint #4 motor unit near its mounting
plate. Then, pull the cord using a force
gauge or similar tool to apply the specified
tension shown in the figure on the right.
U1
axial tension (pulling force):
114 N (11.6
±
0.5 kgf)
U1 belt tension
58 N (5.9
±
0.5 kgf)
3-M4
×
15
+
Washer
Force
Gauge
Joint #4
Motor Unit
To check belt tension with the tension meter, refer to
Maintenance: 8.4 Checking the
Timing Belt Tension (U1, U2 Belts)
.
(6) Connect the connectors.
Connectors: BR4, X241, X44
(7) Bind the cables with a wire tie in their original position as before removed in the
removal step (5).
(8) Remove the User Plate.
For details, refer to
Maintenance: 3.5 User Plate
.
(9) Install the Arm Top Cover.
For details,
refer to Maintenance: 3.1 Arm Top Cover.
NOTE
Summary of Contents for LS10-B
Page 1: ...Rev 6 EM204R4257F SCARA ROBOT LS10 B series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL LS10 B series Rev 6 ...
Page 8: ...vi LS10 B Rev 6 ...
Page 12: ...TABLE OF CONTENTS x LS10 B Rev 6 ...
Page 14: ......
Page 25: ...Setup Operation 1 Safety LS10 B Rev 6 13 LS10 B Figure LS10 B702S ...
Page 65: ...Setup Operation 5 Motion Range LS10 B Rev 6 53 Standard model LS10 B S ...
Page 66: ...Setup Operation 5 Motion Range 54 LS10 B Rev 6 Cleanroom model LS10 B C ...
Page 68: ......
Page 89: ...Maintenance 4 Cable LS10 B Rev 6 77 4 2 Wiring Diagrams 4 2 1 Signal Cable ...
Page 90: ...Maintenance 4 Cable 78 LS10 B Rev 6 4 2 2 Power Cable ...