![Epson LS10-B User Manual Download Page 113](http://html.mh-extra.com/html/epson/ls10-b/ls10-b_user-manual_110798113.webp)
Maintenance 6. Joint #2
LS10-B Rev.6
101
(5) Set the O-ring removed in the removal step (6)
into the O-ring groove of the Arm #1.
If the O-ring is not fit into the groove, please use
another O-ring which is prepared as maintenance
part.
Install the flexspline on the Arm #1.
A: 16-M3
×
28
B: 8-M3
×
32+8-M3 small washer
C: 4-M3
×
12+4-M3 small washer
Arm #2
Reduction
Gear Unit
Arm #1
B
C
O ring
A
Loosely secure all bolts in a crisscross pattern so that the bolts will be secured evenly.
Then, using a torque wrench, tighten each bolt securely in a crisscross pattern at the
torque specified in the table below.
Item
Bolt type
Tightening torque
Joint #2 reduction gear unit
M3
2.35 N
⋅
m (24 kgf
⋅
cm)
Be careful not to apply too much force since it may damage the parts
(6) Apply grease between the motor flange and waveform generator and next inside the
flexspline.
Between the motor flange and waveform generator:
Grease volume
6 g (SK-1A)
Inside the flexspline:
Grease volume
1
6 g (SK-1A)
(7) Set the attached O-ring into the O-ring groove of the circular spline.
Secure the Arm #2 on the circular spline.
(8) Mount and Joint #2 motor.
Follow the installation steps in
Maintenance: 6.1 Replacing Joint #2 Motor
.
NOTE
NOTE
Summary of Contents for LS10-B
Page 1: ...Rev 6 EM204R4257F SCARA ROBOT LS10 B series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL LS10 B series Rev 6 ...
Page 8: ...vi LS10 B Rev 6 ...
Page 12: ...TABLE OF CONTENTS x LS10 B Rev 6 ...
Page 14: ......
Page 25: ...Setup Operation 1 Safety LS10 B Rev 6 13 LS10 B Figure LS10 B702S ...
Page 65: ...Setup Operation 5 Motion Range LS10 B Rev 6 53 Standard model LS10 B S ...
Page 66: ...Setup Operation 5 Motion Range 54 LS10 B Rev 6 Cleanroom model LS10 B C ...
Page 68: ......
Page 89: ...Maintenance 4 Cable LS10 B Rev 6 77 4 2 Wiring Diagrams 4 2 1 Signal Cable ...
Page 90: ...Maintenance 4 Cable 78 LS10 B Rev 6 4 2 2 Power Cable ...