Post and panel installation (mounting version B)
Attach the parts of the mounting kit supplied
with the mounting version B to the back of the
housing, as shown in fig. 4.3:
Cut-out required:
161
+0.5
x 241
+0.5
mm
Installation depth:
134 mm
Pipe diameter:
max. 70 mm
Caution:
Weather protection cover CYY 101
has to be used for installation
outdoors (see “Mounting
accessories”).
Mounting accessories
• Flat gasket for panel mounting
Order no. 50064975
• Weather protection cover CYY 101
for operating the Mycom CPM 152
outdoors.
Material: stainless steel
Order code CYY101-A
2 round post attachment kits (see fig. 4.5)
are also needed for installation on vertical
or horizontal pipes.
• Round post attachment kit for weather
protection cover CYY 101. For attachment
to vertical or horizontal pipes with a
diameter of up to 60 mm.
Material: stainless steel AISI 304
Order no. 50062121
MASTBEF.CDR
Fig. 4.2
Mounting kit for control
panel and post installation
(order no. 50061357)
MONTAGE.CDR
➀
➁
Fig. 4.3
Control panel installation
➀
and post mounting
➁
Mycom CPM 152
300
270
32
0
Y
H
-1
0
1
-6
.CDR
Fig. 4.4
Weather protection cover
M6
66
55
∅
8
30
70
90
Y
H
-10
1
-7
.EPS
Fig. 4.5
Round post attachment kit
for weather protection
cover CYY 101
Installation
mycom CPM 152
8
Hauser