g-4
Connectrix EC-1100 System User Guide
Glossary
Default
Pertaining to an attribute, value, or option that is assumed when
none is explicitly specified.
Device
(1) A piece of equipment, such as a server or storage device, that is
attached to the ED-1032 or similar product. A device as defined here
is not controlled by the Connectrix Product Manager and its
operating parameters. (2) In EMC Symmetrix, a uniquely addressable
physical or logical part of the Symmetrix subsystem, such as a disk.
(This description of is presented here only to clarify a term used in
other EMC documents.)
Dialog Box
A pop-up window containing informational messages or fields to be
modified with desired options.
Director
(1) An enterprise-class Fibre Channel switch. The Connectrix ED-1032
Director contains dual power supplies, a fan module, and four types
of cards, which provide Fibre Channel ports, as well as processing
and memory functions. (2) A board-level module in the Symmetrix
that provides the interface between host channels (via an associated
adapter module in the Symmetrix) and Symmetrix disk devices. (This
description of is presented here only to clarify a term used in other
EMC documents.)
DNS
See Domain Name Service Name.
Domain Name
Service Name
Host or node name for a system that is translated to an IP address
through a name server. All DNS names have a host name component
and, if fully qualified, a domain component, such as host1.abcd.com. In
this example host1 is the host name.
E
E_D_TOV
See Error Detect Time Out Value.
EFC Server
See Connectrix Service Processor.
E_Port
Expansion Port, a physical interface within the Fibre Channel switch
that attaches to another E_Port on a Fibre Channel switch through an
interswitch link.
Error Detect Time Out
Value
Defines the time the switch waits for an expected response before
declaring an error condition. The error detect time out value
(E_D_TOV) can be set within a range of two-tenths of a second to one
second using the ED-1032 Product Manager.
Summary of Contents for Connectrix EC-1100 System
Page 4: ...Connectrix EC 1100 System User Guide iv...
Page 8: ...Connectrix EC 1100 System User Guide viii Contents...
Page 12: ...xii Connectrix EC 1100 System User Guide Figures...
Page 14: ...xiv Connectrix EC 1100 System User Guide Tables...
Page 22: ...xxii Connectrix EC 1100 System User Guide Warnings and Cautions...
Page 78: ...2 2 46 Connectrix EC 1100 System User Guide Connectrix Manager Administration...
Page 83: ...3 Fabric Manager Views 3 5 Fabric Manager Figure 3 3 Zoning View Showing Active Zone Set...
Page 92: ...3 3 14 Connectrix EC 1100 System User Guide Fabric Manager...
Page 128: ...4 4 36 Connectrix EC 1100 System User Guide Fabric Zoning...
Page 140: ...5 5 12 Connectrix EC 1100 System User Guide Connectrix Manager Logs...
Page 196: ...F F 6 Connectrix EC 1100 System User Guide Power on and Power off Procedures...
Page 212: ...s 4 Connectrix EC 1100 System User Guide Sales and Service Locations...