Doc
#
E149701
3-1
3: Mechanical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3: Mechanical Installation
3.1: Introduction
The Shark® 200 meter can be installed using a standard ANSI C39.1 (4” round) or an
IEC 92 mm DIN (square) form. In new installations, simply use existing DIN or ANSI
punches. For existing panels, pull out old analog meters and replace them with the
Shark® 200 meter. See 3.4: Transducer Installation on page 3-6, for Shark® 200T
transducer installation. See 4.8: Electrical Connection Diagrams on page 4-8, for wir-
ing diagrams.
NOTE:
The drawings shown below and on the next page give you the meter dimen-
sions in inches and centimeters [cm shown in brackets]. Tolerance is +/- 0.1” [.25
cm].
Figure 3.1: Meter Front and Side Dimensions
0.06 [
0.15
]
0.
77
[
1.95
]
5.02 [12
.
75]
Gasket
3.25
[8
.
2
6
]
4.85
[12
.
3
2
]
4.85 [12
.
3
2
]
0.95
[2
.
4
1
]
Summary of Contents for Shark 200
Page 1: ...V 1 24 March 15 2018 ...