19
3. MAKEREADY
3
PUTTING INTO OPERATION
3.1 TRANSPORT AND INSTALLATION
The tester is supplied fully packed and is only allowed to be removed from
the packaging in the immediate vicinity of the installation location.
The device can be installed in a suitable industrial rack or housing for 19“
plug-ins. The device must be secured against
unintentional movement
.
The surface on which the device is installed must be appropriate for the
weight of the tester (approx. 30 kg!) and always provide a secure mount-
ing for the device.
During installation it is to be ensured the labels with information and safety
labels on the device are not covered.
3.2 AMBIENT CONDITIONS
The tester is not allowed to be operated in a dusty, inflammable, aggres
-
sive or humid environment. The values permitted for temperature and
atmospheric humidity are given in chapter 9 „Technical data“.
3.3 INSTALLATION IN HOUSING OR RACK
Note:
Slide the device carefully to the rear to the stop. Do not jam the
device on insertion.
After the inserting the device in a housing, it must be secured at the front
using 4 screws.
Operation with a loosely inserted tester is not allowed!
Installation without a modular system or housing is not allowed.
Full-electronic G1-1 HV DC-Tester
Fig. 3.1: Tester with out display installed in 19“ / 4HU housing
Summary of Contents for G1-1
Page 38: ...38 4 OPERATING MODES 4 2 2 Normal mode input step Full electronic G1 1 HV DC Tester...
Page 39: ...39 4 OPERATING MODES 4 2 3 Normal mode output step Full electronic G1 1 HV DC Tester...
Page 40: ...40 4 OPERATING MODES 4 2 4 Normal mode time step Full electronic G1 1 HV DC Tester...
Page 133: ...Expires 04 19 2016...