72
10. MENU SYSTEM
(PARAM)
10.5 Test plan Management and Automatic testing
After opening „Test plan management“, the operator must enter the pass-
word for level 2 (PARAM).
Fig. 10:20: Main menu - Test plans
manual test
set of parameters
testplans
device settings
setup
plan
param
test
Main menu
remote
Fig. 10.21: Test plan management - test plan selection
test plan
test plan
test plan
test plan
delete
create
edit
load
Test plan
plan
Full-electronic G1-1 HV DC-Tester
The menu is used for adding test plans. Test plans contain one or more
test steps and so form a defined test sequence. The sequence is displayed
in the form of a list; the device runs through the list from top to bottom.
Depending on the options fitted to the device, e.g. HV, ISO. steps that are
used to provide information to/prompt the operator, to poll buttons or to
poll/set a digital input/output (option).
To be able to assemble test plans, test steps must be defined for the indi
-
vidual test types (HV, ISO). This action is carry out on the main menu with
"set of parameters", on this topic see chapter 10.4. „set of parameters“.
Summary of Contents for G1-1
Page 38: ...38 4 OPERATING MODES 4 2 2 Normal mode input step Full electronic G1 1 HV DC Tester...
Page 39: ...39 4 OPERATING MODES 4 2 3 Normal mode output step Full electronic G1 1 HV DC Tester...
Page 40: ...40 4 OPERATING MODES 4 2 4 Normal mode time step Full electronic G1 1 HV DC Tester...
Page 133: ...Expires 04 19 2016...