64
10. MENU SYSTEM
(PARAM)
load
Fig. 10.7: Manual test - test screen - load parameter
load
10.3.2
Load parameter
After opening „load, the operator must enter the password for level 2
(parameters).
The menu is used for editing and adding parameter sets. Parameter sets
can be assembled into test plans and in this way produce a defined test
sequence (see test plan management). The related test steps must be
defined for the individual test types (HV, ISO; TIME).
The existing parameter sets are listed in the left field .By touching the but
-
ton "load", it is possible to open and edit the parameter set.
Fig. 10.9: Load parameter set
Full-electronic G1-1 HV DC-Tester
0.00 [kV]
00.00 [mA]
000.0 [s]
load
HV_1000 DC
Status: ready for test!
Start test with RUN !
: HV (DC)
: 1.00 kV
: 0.10 kV/s
: off
: off
: 0.35 kV
: 6.0 s
: off
: 0,50 mA
: 0.00 mA
mode
U
Umin
t
delay
Imax
Imin
HV_1000 DC
HV_2000 DC
HV_3000 DC Ramp up
HV_4000 DC Ramp u/d
load
load
load
load
Parameter set
Scroll to list start
Parameter set list
Scroll to list end
- Load the desired parameter set by touching the button "load". (eg.
HV_1000 DC).
Summary of Contents for G1-1
Page 38: ...38 4 OPERATING MODES 4 2 2 Normal mode input step Full electronic G1 1 HV DC Tester...
Page 39: ...39 4 OPERATING MODES 4 2 3 Normal mode output step Full electronic G1 1 HV DC Tester...
Page 40: ...40 4 OPERATING MODES 4 2 4 Normal mode time step Full electronic G1 1 HV DC Tester...
Page 133: ...Expires 04 19 2016...