10
Step 3
– When PCB is in place the ORP
control holder will be visible
poking through the front panelling.
Reconnect ORP control knob to
its holder ensuring it is able to
be adjusted to both minimum &
maximum settings.
Step 4
– Replace the protective covering
on the PCB using a Phillips head
screwdriver (one point).
Summary of Contents for ESC 16
Page 3: ...Installation and Operating Instructions ESC 16 ESC 24 ESC 36 ESC 48 FOR MODELS TM...
Page 24: ...22 Notes...
Page 25: ......
Page 26: ...P N 401633 2 TM...
Page 27: ...ECO matic ESC Chlorinator SERVICING INSTRUCTIONS ESC SERVICE GUIDE...
Page 52: ...26 Troubleshooting Guides...
Page 53: ...27...
Page 54: ...28...
Page 55: ...29...
Page 56: ...30...
Page 64: ...38 NOTES...
Page 65: ...39...
Page 68: ...ESC SERIES SALT CHLORINATOR...
Page 69: ...EcoSalt BMSC Chlorinator SERVICING INSTRUCTIONS ECOSALT SERVICE GUIDE...
Page 89: ...21 Trouble Shooting Guides...
Page 90: ...22...
Page 91: ...23...
Page 92: ...24...
Page 97: ...EcoSpa ORP Controlled Sanitising System SERVICING INSTRUCTIONS ECOSPA SERVICE GUIDE...
Page 109: ...13 Step 4 Place cable ties into position holding the fuse wires in place...
Page 112: ...16 Trouble Shooting Guides...
Page 113: ...17...
Page 114: ...18...
Page 115: ...19...
Page 116: ...20...
Page 117: ...21 This page intentionally blank...
Page 118: ...22 NOTES...
Page 119: ...23 NOTES...