3
Disassembling/
Assembling the Unit
Step 1
– Remove the screw in the front
panel using a Phillips head
screwdriver (two point) then lift the
front panel off.
Step 1
– Place the top half of the chlorinator
flush with the top panel
Note: Before closing unit ensure
that wiring loom which connects
to the PCB is correctly placed
behind the internal panel & is not
preventing the unit from closing.
Disassembly
Assembly
Step 2
– Using both hands lift the top half
approximately 15mm up from the
chlorinator & slide out until the top
half is free then flip open the front
cover.
Step 2
– When closing unit note the locating
lug has to be inside the chlorinator
otherwise it will not close. With the
locating lug on the interior of the
chlorinator move the top half of
the chlorinator into place over the
screw hole & tighten screw using
a Phillips head screwdriver (two
point).
Summary of Contents for ESC 16
Page 3: ...Installation and Operating Instructions ESC 16 ESC 24 ESC 36 ESC 48 FOR MODELS TM...
Page 24: ...22 Notes...
Page 25: ......
Page 26: ...P N 401633 2 TM...
Page 27: ...ECO matic ESC Chlorinator SERVICING INSTRUCTIONS ESC SERVICE GUIDE...
Page 52: ...26 Troubleshooting Guides...
Page 53: ...27...
Page 54: ...28...
Page 55: ...29...
Page 56: ...30...
Page 64: ...38 NOTES...
Page 65: ...39...
Page 68: ...ESC SERIES SALT CHLORINATOR...
Page 69: ...EcoSalt BMSC Chlorinator SERVICING INSTRUCTIONS ECOSALT SERVICE GUIDE...
Page 89: ...21 Trouble Shooting Guides...
Page 90: ...22...
Page 91: ...23...
Page 92: ...24...
Page 97: ...EcoSpa ORP Controlled Sanitising System SERVICING INSTRUCTIONS ECOSPA SERVICE GUIDE...
Page 109: ...13 Step 4 Place cable ties into position holding the fuse wires in place...
Page 112: ...16 Trouble Shooting Guides...
Page 113: ...17...
Page 114: ...18...
Page 115: ...19...
Page 116: ...20...
Page 117: ...21 This page intentionally blank...
Page 118: ...22 NOTES...
Page 119: ...23 NOTES...