Putting the SmartWire Darwin
network into operation
21
02/09 AWB2723-1612en
Switching on when the gateway target configuration
is stored
If a configuration is stored in the gateway, each time the
supply voltage is switched on it is checked whether the
slaves actually found on the network comply with the stored
gateway target configuration. The result of the check is
displayed via the SmartWire-Darwin status LED on the
gateway:
Description
SmartWire Darwin
status LED
Data interchange
between the gateway and
SmartWire Darwin slaves
The current actual configuration complies
with the gateway target configuration.
Green continuous light
yes
A necessary SWD slave is missing or the
gateway target configuration does not
comply with the actual configuration.
Flashing (red)
no
Slave addressing is active (after power
On or the download of a planned
configuration with empty modules).
Flashing (green)
no
Short circuit on the 15 V power supply or
no SmartWire Darwin slave is connected.
Red continuous light
no
Summary of Contents for Moeller SmartWire-Darwin EU5C-SWD-CAN
Page 8: ...4 02 09 AWB2723 1612en ...
Page 28: ...24 02 09 AWB2723 1612en ...
Page 56: ...52 02 09 AWB2723 1612en ...
Page 62: ...58 02 09 AWB2723 1612en ...