Putting the SmartWire Darwin
network into operation
23
02/09 AWB2723-1612en
So the prerequisite for data interchange is that the
configuration drawn up on the PLC system (= planned
configuration) complies with the configuration actually
available on the gateway. The result of this check is signalled
on the gateway via the SmartWire Darwin configuration LED.
Table 2:
Signals of the SmartWire Darwin configuration LED
Description
SmartWire Darwin-
configurations LED
Data interchange
between the gateway and
the PLC via PROFIBUS
The planned configuration complies with
the gateway target configuration.
Green continuous light
yes
The planned configuration does not
comply with the gateway target
configuration, but is compatible with it
(list of the devices that are compatible
with one another
Flashing (green)
yes
The planned configuration and the
gateway target configuration are not
compatible.
Red continuous light
no
Summary of Contents for Moeller SmartWire-Darwin EU5C-SWD-CAN
Page 8: ...4 02 09 AWB2723 1612en ...
Page 28: ...24 02 09 AWB2723 1612en ...
Page 56: ...52 02 09 AWB2723 1612en ...
Page 62: ...58 02 09 AWB2723 1612en ...