Chapter 4:
IQ 250/260 Meter Electrical Installation
www.eaton.com
IB02601006E
4-3
CT Leads Pass Through (No Meter Termination)
The second method allows the CT wires to pass through the CT Inputs without terminating at the meter. In this
case, remove the Current Gills and place the CT wire directly through the CT opening. The opening will accomo-
date up to 0.177” / 4.5mm maximum diameter CT wire.
CT Wire passing through meter
Current Gills removed
Figure 4.2: Pass-Through Wire Electrical Connection
Summary of Contents for IQ 250
Page 2: ......
Page 22: ...3 6 IB02601006E www eaton com Chapter 3 Mechanical Installation IQ 250 260 Meter...
Page 38: ...4 16 IB2601006E www eaton com Chapter 4 Electrical Installation IQ 250 260 Meter...
Page 104: ...A 6 IB02601006E www eaton com Appendix A IQ 250 260 Navigation Maps IQ 250 260 Meter...
Page 134: ...A IQ 250 260 Meter Appendix B Modbus Mapping www eaton com IB02601006E MM 28...