SCWD-QS (12/16)
Page 22
Flash Codes
– Three Phase
A Red LED indicator will flash under the following conditions. [NOTE: LED fault indicator is turned
off in normal running mode.]
a) Reverse Phase: (1 / 2 secs)
b) Fault Mode/Cycle Delay: (1 / 4 secs)
c) Low Voltage/Over Voltage: 2 / 2 secs)
Flash Code (Reverse Phase: (1 / 2 secs))
-
Displayed
if the supply “Phase Sequence” gets reversed before or after a start.
- Re-start is attempted after 3 minutes.
Flash Code (Fault Mode / Cycle Delay: (1 / 4 secs))
-
Displayed for “Cycle delay” between two consecutive softstarts or other faults mentioned
below.
- Re-start is attempted after a default period of 3 minutes.
- Other possible reasons for this Fault mode indicator can be due to
- a failed Softstart attempt,
- intermittent power loss (duration longer than 100ms),
- frequency out of range
Flash Code (Low Voltage / Over Voltage: (2 / 2 secs))
-
Displayed for “Low supply voltage” or “High supply voltage” before or after a softstart.
-
If voltage is out of range before a start, a re-start is attempted after 50 seconds.
-
If voltage is out of range after a start, a re-start is attempted after 3 minutes.
Summary of Contents for SCWD-024-1C
Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...
Page 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...
Page 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...