SCWD-QS (12/16)
Page 50
Figure 32. Compressor Unit Voltage Information
The following compressor checklist is provided to analyze the compressor and determine if it is
operating properly or if it is faulty:
1. Electrical Service Panel
– turn power off.
a. Check circuit terminal connections for tightness
b. Circuit breaker sized right?
c. Wire size correct? (check NEC or local codes)
2. Check capacitor
or other start components for visible bulges, leaks, overheating or
loose wire connections.
3. Test capacitor
and start components and replace if necessary. Capacitors can be
checked by substitution or with capacitance meter. OK if reads ±10% of the
manufacturer’s specification.
4. Check incoming power supply voltage
to determine whether it is within acceptable
voltage range. (See Figure 32)
5. Check voltage at compressor unit terminals
to determine whether it is within
acceptable voltage range. (See Figure 32)
6. Running Amperage.
Connect a clip-on type ammeter to the (common) lead to the
compressor. Turn on the supply voltage and energize the unit. The compressor will
initially draw high amperage; it should soon drop to the RLA value (See Figure 7) or less.
If the amperage stays high, check the motor winding resistance and/or run capacitor.
Summary of Contents for SCWD-024-1C
Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...
Page 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...
Page 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...