SCWD-QS (12/16)
Page 2
Table of Contents
List of Figures..................................................................................................................................... 3
List of Revisions ................................................................................................................................. 4
Model Nomenclature .......................................................................................................................... 5
Safety ................................................................................................................................................. 6
Equipment Manuals............................................................................................................................ 6
Installation .......................................................................................................................................... 7
1)
Component Matching ........................................................................................................... 7
2)
Compressor Unit Placement ................................................................................................ 8
3)
Refrigeration ........................................................................................................................ 9
4)
System Applications and Electrical .................................................................................... 13
5)
SureStart ........................................................................................................................... 19
6)
Plumbing ........................................................................................................................... 23
7)
Antifreeze Protection ......................................................................................................... 25
8)
Internal Heat Recovery System ......................................................................................... 27
Earth Loop Protection System .......................................................................................................... 30
1)
Anode Wire Installation ...................................................................................................... 30
2)
EPS Operation and Service ............................................................................................... 35
3)
Voltage Verification ............................................................................................................ 36
Start-Up Process .............................................................................................................................. 37
1)
System Leak Check ........................................................................................................... 37
2)
Evacuation ......................................................................................................................... 40
3)
Initial Charge ..................................................................................................................... 42
4)
Final Charge ...................................................................................................................... 44
Troubleshooting ............................................................................................................................... 49
1)
Compressor ....................................................................................................................... 49
2)
System .............................................................................................................................. 53
Commissioning Document ................................................................................................................ 56
Tools and Equipment ....................................................................................................................... 57
Triple Evacuation ............................................................................................................................. 58
Appendix A: Electrical Diagrams
– No SureStart ............................................................................. 59
Appendix B: Functions of the Nano-PLC .......................................................................................... 62
Summary of Contents for SCWD-024-1C
Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...
Page 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...
Page 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...