SCWD-QS (12/16)
Page 6
Safety
Warning, Caution and Important notices appear throughout the manual. Read these items carefully
before attempting installation, servicing or troubleshooting the equipment.
Equipment Manuals
The following is a listing of the equipment installation manuals that are provided with each component
specified for this EarthLinked
®
system.
Series SV Service Valve and AKS Adapter Kit
Series HCM Hybrid Cooling Module
Series GSTE Storage Water Heater
Series GSTE Hydronic Buffer Tank
Model HHK/CWK-1872 Temperature Control Kit
Earth Loop Specification and Installation Manual
Earth Loop Protection Kit Installation Manual
IMPORTANT!
Notification of installation, operation or maintenance information which
is important, but which is not hazardous.
WARNING!
Indicates a hazardous situation, which if not avoided will result in
serious injury or death, or equipment or property damage.
CAUTION!
Indicates a potentially hazardous situation or an unsafe practice, which
if not avoided, may result in injury, or equipment or property damage.
IMPORTANT!
Read and follow all installation instructions in these manuals,
appropriate for the EarthLinked
®
system being installed, BEFORE
initiating the Start-Up procedure.
Summary of Contents for SCWD-024-1C
Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...
Page 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...
Page 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...