SCWD-QS (12/16)
Page 57
Tools and Equipment
The purpose of the following list is to highlight key pieces of equipment, tools and materials necessary
for the installation, maintenance and servicing of EarthLinked
®
Heating and Cooling System HVAC
(above ground) equipment.
The professional HVAC technician is expected to have a compliment of standard tools for the general
servicing of refrigeration equipment.
Equipment, Tools and Materials
Vacuum Pump (7 CFM or greater capacity with isolation valve)
Digital Vacuum (micron) Gauge and Isolation Valve
Schrader Valve Core Removal Tool (quantity of 2)
Charging/Evacuating Manifold for R-410A
Charging/Hi-Vacuum Hoses (black, quantity of 6)
Digital Refrigerant Scale
Digital Thermometer (±
1⁰F accuracy)
Digital Sling Psychrometer
Air Flow Meter (for air handlers)
Nitrogen Tank with 0
– 600 psig Regulator and Handtruck
Oxy-acetylene Welding Torch Set
15% Silver Brazing Alloy
Refrigerant Recovery Unit (1/2 #/minute minimum vapor capacity)
Recovery Cylinder (50# capacity)
Halogen Leak Detector
Digital VOM
Digital Clamp-on Ammeter
Digital Water Flowmeter (3 to 30 gpm)
Tubing Cutters
Tubing Benders
Nut Drivers
Cordless Drill (3/8”)
Swaging Kit
Deburring Tool
Drill Bit Set
Inspection Mirror
Summary of Contents for SCWD-024-1C
Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...
Page 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...
Page 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...