background image

SCWD-QS (12/16) 

 

Page 35 

2)  EPS Operation and Service 

Reference Figure 20 for the EPS components in the compressor unit electric box. 

 

Figure 20.  Electric Box with EPS Components  

With power 

ON

, and viewing the EPS Module in the compressor unit electric box, the EPS 

green 

light

 should be illuminated, indicating there is power to the EPS system. 

If the 

green light 

is 

NOT

 illuminated, verify that 208/230 volt power is available to the EPS power 

supply. Also check the fuse. Check and replace, as appropriate, the fuse for the EPS Power Supply 
as shown in Figure 20.  For service purposes, a spare fuse has been factory supplied and is located 
in the electrical box.  The replacement fuse is 

Littlefuse 213 Series Slo-Blo

®

 rated at 250 Volts, 2 

Amperes, P/N 0213002MXP.

  This is also Allied Electronics Stock Number R1090710.

  

If 208/230 volt power is available and the fuse is intact, contact ETI technical support at 1-863-701-
0096. 
 
If 

there is an opening

 in the earth loop electrical circuit, the 

audible signal will be heard

.  After 

shutting power 

OFF

, all electrical connections from the EPS module to the earth loop system should 

be checked and adjusted as appropriate to ensure good electrical contact.

 

NOTE

: In extremely dry soil conditions (with low conductivity), the EPS system might not close the 

alarm relay upon initial start-up or after an interruption in power. Resetting the alarm relay can be 
done by quickly shorting the anode, positive to ground. It may be necessary to strip away part of the 
anode wire insulation to do so. 

 

If it is necessary to operate the heating and cooling system while the EPS is down for service, the 
EPS power may be temporarily disengaged to eliminate the audible alarm, by removing the EPS/EDM 
Fuse shown in Figure 20. Please note this step also de-energize the EDM system. Upon completion 
of servicing the EPS, replace the fuse to energize the EPS and EDM systems and maintain warranty 
coverage. 

The EPS board is not field serviceable.  

Summary of Contents for SCWD-024-1C

Page 1: ...SCWD QS 12 16 2016 EarthLinked Technologies Inc Classic Series SCWD Geothermal Heating and Cooling System Quick Start Instructions...

Page 2: ...7 Antifreeze Protection 25 8 Internal Heat Recovery System 27 Earth Loop Protection System 30 1 Anode Wire Installation 30 2 EPS Operation and Service 35 3 Voltage Verification 36 Start Up Process 37...

Page 3: ...7 Figure 12c GSTE Storage Water Heater Service Connections 28 Figure 12d GSTE Storage Water Heater Tank Top View 28 Figure 13 Compressor Cabinet Socket Cap 30 Figure 14 Disassembled Plug Connector 31...

Page 4: ...trical Schematic Diagram No SureStart 230 3 60 61 List of Revisions New EPS system Revised Electric Box Carried over SureStart does not come standard on Classic Series compressor units anymore It rema...

Page 5: ...stallation and service by an ETI trained and authorized installer consistent with this manual will void and nullify the limited warranty coverage for the system Earthlinked Technologies shall not be l...

Page 6: ...HHK CWK 1872 Temperature Control Kit Earth Loop Specification and Installation Manual Earth Loop Protection Kit Installation Manual IMPORTANT Notification of installation operation or maintenance inf...

Page 7: ...efore placing the compressor unit outside or indoors review the guidelines in Figure 2 INSTALLATION GUIDELINES All refrigerant and water lines between these above ground components must be insulated w...

Page 8: ...rance around the unit for service is illustrated in Figure 3 However local codes and applicable regulations take precedence Compressor unit or other refrigerant containing system components located in...

Page 9: ...rovide space cooling shall be equipped with an EarthLinked Hybrid Cooling Module HCM when 1 Required by the performance tables OR 2 System is in a Cooling dominant application where soil thermal condu...

Page 10: ...ugged 7 DWT Supply Braze 1 2 1 2 1 2 1 2 1 2 1 2 8 DWT Return Braze 1 2 1 2 1 2 1 2 1 2 1 2 9 HWT Return Braze 7 8 7 8 7 8 1 1 8 1 1 8 1 1 8 10 HWT Supply Braze 7 8 7 8 7 8 1 1 8 1 1 8 1 1 8 N Namepla...

Page 11: ...aution This compressor unit is equipped with Copeland Ultra 32 3MAF Polyol Ester Oil POE This is the only brand and type of oil that is recommended for use with ETI compressor units POE oil absorbs si...

Page 12: ...UID VAPOR 2 0 Tons 024 3 8 5 8 2 5 Tons 030 3 8 3 4 3 0 Tons 036 1 2 3 4 3 5 Tons 042 1 2 3 4 4 0 Tons 048 1 2 7 8 5 0 Tons 060 1 2 7 8 Liquid and Vapor lines must BOTH be insulated with Armaflex or e...

Page 13: ...e the comfort and efficiency of system operation See Appendix B detailing the Nano PLC functions for the hydronic heating and cooling systems The Earth Loop Protection Control System comprised of the...

Page 14: ...TP5 230 3 60 207 253 83 1 15 1 19 0 30 042 1C ZP44K5E PFV 230 1 60 207 253 135 0 23 9 29 0 50 042 2C ZP44K5E TF5 230 3 60 207 253 98 0 16 1 20 0 30 048 1C ZP51K5E PFV 230 1 60 207 253 134 0 29 4 36 0...

Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...

Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...

Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...

Page 18: ...SCWD QS 12 16 Page 18 Figure 10 SCWD Hydronic Heating Cooling Water Heating System Field Wiring Diagram...

Page 19: ...tics of the compressor to further refine the starting cycle on each recurring start If the compressor fails to start the module will terminate the start attempt after 1 second and initiate a 3 minute...

Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...

Page 21: ...set the hardstart counter and will require 3 failed starts again to force it back into Lockout mode Lockout can be cleared anytime through a power reset of the SureStart device Flash Code Slow Flash 1...

Page 22: ...e Cycle Delay 1 4 secs Displayed for Cycle delay between two consecutive softstarts or other faults mentioned below Re start is attempted after a default period of 3 minutes Other possible reasons for...

Page 23: ...SCWD QS 12 16 Page 23 6 Plumbing A typical primary hydronic plumbing circuit for an SCWD system is illustrated in Figure 12 Figure 12a Typical SCWD Primary Hydronic Circuit Plumbing...

Page 24: ...4 Temperature Controller Model HHK 1872 is a hydronic heating controller and Model CWK 1872 is a chilled water temperature controller These digital controllers can be mounted remotely and come with a...

Page 25: ...it can be purchased as inhibited propylene glycol The following are examples of manufacturers for the above Straight propylene glycol Chemical Specialties Inc www chemicalspec com spg html Inhibitor...

Page 26: ...tely refill the system allowing for liquid expansion due to operating temperature Circulate the inhibited propylene glycol antifreeze solution for at least 24 hours to ensure complete mixing Check the...

Page 27: ...system supplements hot water production but does not replace the standard storage water heater sized for the application The Heat Recovery System may be plumbed into an existing standard water heater...

Page 28: ...SCWD QS 12 16 Page 28 Figure 12c GSTE Storage Water Heater Service Connections Figure 12d GSTE Storage Water Heater Tank Top View...

Page 29: ...circulation independent of compressor operation The GSTE storage water heaters are available in 60 80 and 119 US gallon capacities all of which have a 4 5 kW electric heating element which provides th...

Page 30: ...sor Cabinet Socket Cap The EPS KIT contains the plug connector which will be field assembled and connected to the anode wire The steps to install the anode wire to the plug connector assembly are as f...

Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...

Page 32: ...f the strands of anode wire on one terminal Figure 15 Anode Wire Insertion After inserting all strands of the anode wire into one of the terminals on the plug insert tighten the wire in place by tight...

Page 33: ...n the plug body as shown in Figure 17 Next slide the gland cage over the gland and slide the gland nut firmly against the gland cage with the gland nut against the plug body Engage the threads of the...

Page 34: ...embled re connect the sealing cap assembly tool to the socket on the compressor unit cabinet After aligning the electrical contact pins manually engage the threads on the plug locking cap with the thr...

Page 35: ...I technical support at 1 863 701 0096 If there is an opening in the earth loop electrical circuit the audible signal will be heard After shutting power OFF all electrical connections from the EPS modu...

Page 36: ...e in contact with either the earth loop liquid or the vapor line Make sure the probe is in contact with the copper with no insulation in the way As an alternative you can also use the service valve Se...

Page 37: ...lectronic leak detector and bubble solution Repair leaks as appropriate prior to evacuation Evacuation and charging of the system is done through the compressor unit All of the refrigerant containing...

Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...

Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...

Page 40: ...pen the vacuum pump isolation valve and start the pump Evacuate the system down to 400 MICRONS or less as read on the digital vacuum gauge After 400 microns or less has been achieved isolate the vacuu...

Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...

Page 42: ...weather it may be necessary to warm the refrigerant container to charge to 3 pounds per ton 4 After completing the initial refrigerant charge to the system turn the LP valve off re install the Schrad...

Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...

Page 44: ...erant level drops below the middle sight glass during this time slowly add refrigerant until the liquid level stabilizes at the middle sight glass 7 With the liquid refrigerant level at the middle sig...

Page 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...

Page 46: ...SCWD QS 12 16 Page 46 Figure 28 Charging to the Middle Sight Glass Heat only units Figure 29 Final charging to the Top Sight Glass Heat Cool units...

Page 47: ...15 68 8 20 77 1 25 86 0 30 95 5 35 105 7 40 116 6 45 128 3 50 140 8 55 154 1 60 168 2 65 183 2 70 199 2 75 216 1 80 234 0 85 253 0 90 273 0 95 294 1 100 316 4 105 339 9 110 364 6 115 390 5 120 417 7...

Page 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...

Page 49: ...rence Figure 32 CAUTION SERVICE MAY BE PERFORMED ONLY BY AN EARTHLINKED TECHNOLOGIES AUTHORIZED PROFESSIONAL HVAC OR REFRIGERATION SERVICE PERSON USE ONLY SAFE AND APPROVED SERVICE TECHNIQUES IMPROPER...

Page 50: ...ponents and replace if necessary Capacitors can be checked by substitution or with capacitance meter OK if reads 10 of the manufacturer s specification 4 Check incoming power supply voltage to determi...

Page 51: ...igure 7 the compressor is locked mechanically and should be removed from the system and replaced Verify before removing 7 Motor Circuit Testing Using a digital volt ohmmeter VOM measure the resistance...

Page 52: ...each compressor terminal as shown in Figure 34 A short circuit at a high voltage terminal indicates a motor defect grounded Figure 34 Compressor Motor Grounded Winding Test 9 Compressor not pumping C...

Page 53: ...compressor diagram replace the compressor Replace filter drier and run capacitor 10 SureStart fault 10 Check the SureStart to see if the red LED is flashing Flashing codes are in section Installation...

Page 54: ...ve stuck in heat mode 4 Contact ETI Technical Support at 863 701 0096 F Compressor turns off on thermal overload check until compressor s temperature reaches room temperature before determining the in...

Page 55: ...mal pressure and temperature conditions Refer to Unit performance table 10 Defective pressure control 10 Check limit cut off pressures Control is set to actuate at 5 R 22 407C 25psig R 410A low pressu...

Page 56: ...d system components and system performance for air and hydronic heating and cooling IMPORTANT All EarthLinked system should be commissioned and their location recorded The selected earth loop configur...

Page 57: ...um micron Gauge and Isolation Valve Schrader Valve Core Removal Tool quantity of 2 Charging Evacuating Manifold for R 410A Charging Hi Vacuum Hoses black quantity of 6 Digital Refrigerant Scale Digita...

Page 58: ...s 1500 microns After reaching 1500 microns isolate the digital vacuum gauge 3 Purge hoses with nitrogen Then allow a small amount of dry nitrogen to enter the system until the LP gauge shows about 5 p...

Page 59: ...The following compressor unit electrical diagrams do not include SureStart They are as follows Figure A1 SCWD Compressor Unit Electrical Schematic Diagram No SureStart 230 1 60 60 Figure A2 SCWD Comp...

Page 60: ...SCWD QS 12 16 Page 60 Figure A1 SCWD Compressor Unit Electrical Schematic Diagram No SureStart 230 1 60...

Page 61: ...SCWD QS 12 16 Page 61 Figure A2 SCWD Compressor Unit Electrical Schematic Diagram No SureStart 230 3 60...

Page 62: ...nic Heat Cool SCW and SCWD units keep the same functions as always for installation and use The Nano PLC simply replaces the analog hardware and adds two performance assurance functions 1 Performance...

Reviews: