1) Anode Wire Installation
Prior to this, the below grade installation of the DIRECT AXXESS® Earth Loop System, including the
Earth Loop Protection System anode and anode wire has been completed per the
Earth Loop
Protection Kit Manual
, and at this point the anode wire is ready to be connected to the compressor
unit.
The earth loop protection system connection to the anode wire is on the back side of the compressor
cabinet as illustrated in Figure 13, showing the electrical
socket
with the
sealing cap.
Figure 13. Compressor Cabinet Socket/Cap
The EPS-KIT contains the
plug connector
, which will be field assembled and connected to the
anode wire.
The steps to install the
anode wire
to the
plug connector assembly
are as follows.
Remove the
sealing cap assembly tool
from the compressor unit cabinet shown in Figure 13 and
14. Using the
sealing cap assembly tool,
as shown in Figure 14, unscrew the
locking ring
from the
plug connector assembly
to access the
plug insert.
Then, remove the
gland nut, gland cage,
and gland
from the other end of the
plug body
as shown in Figure 14.
WARNING!
All power of the EarthLinked
®
System is to be shut OFF at the disconnect while
field wiring the Earth Loop Protection System. Failure to do so may result in
serious injury or death, or equipment or property damage.
Summary of Contents for SCWD-024-1C
Page 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Page 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Page 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Page 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Page 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Page 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Page 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Page 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Page 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...