PDA-100 Photodiode Array Detector
Index-4
Doc. 031644-02 9/03
Temperature stabilization, 2-6
N
Negative absorbance, 3-8, 3-15
Guidelines for selecting, 3-26
Normal phase solvents, 2-6, 3-15, B-3
NOTES in manual, 1-7
O
Offset level, 3-8
Operating parameters
Optimization, 3-15 – 3-22, 3-24 – 3-26
Cooling, 2-8
Leak sensor, 2-3
Leak tray, 2-3
Optical system
Components, 2-4
Illustration, 2-4
P
Passivation, 3-29
PDA-100 Photodiode Array Detector
Applications, 3-1
Automated control, 3-5, 3-8 – 3-9
Dimensions, A-1
Installation instructions, B-8
Maintenance, 3-29
Parts replacement, 5-1
Performance optimization, 3-15 – 3-22,
Power cord, B-2
Power supply, 2-7, A-1, B-2
Power switch, B-2
Safety standards, 1-6
Ship Kit, B-1, B-4
Shutdown procedure, 3-29
Spare parts, C-1
Tubing connections, 5-1
Unpacking instructions, B-1
Warranty, 5-1
Weight, A-1
Peak height, 3-16, 3-19
Peak identification, 1-2 – 1-3, 3-18
Peak purity, 1-2 – 1-3, 3-5, 3-18
Peak resolution, 3-15
PeakNet 6 software, 1-1
3D option, 1-2, 3-5
Control of PDA-100, 3-5, 3-8 – 3-9
Leak alarm, 2-3
Chromatography software
Peaks
Asymmetrical, 3-16
Co-eluting, 3-17
Improving height, 4-11
Improving shape, 4-12
PEEK flow cell
Chemical compatibility, 2-6, 3-15, A-3,
Operating pressure, A-3
Optical path length, A-3
Part number, 2-6
Cells
PEEK systems
Flow cell
Tubing connections, 5-1
PGM files, 2-12, 3-5, 3-9, 4-10
PGM Wizard, 3-9
Photodiode array, 1-1, 2-4 – 2-5, 2-8
Photodiode array detection, 1-2
Polarity, 2-9
Post-column reagents, 4-11