
64
CORN CRACKER INSTALLATION INSTRUCTIONS
STEP 5 - FIGURE 81
Lift the Corn Cracker (item 1) slowly in place. Bolt the
two front pivot supports (item 2) to the Forage Harvester
frame holder (item 3) with six 1/2” x 1” lg. hex. bolts (item
4) and six flange nuts.
STEP 6 - FIGURE 81
Secure both rear sides with two 1/2” x 1” lg. hex. bolts
(item 5) and two flange nuts. Tighten all nuts properly.
Figure 81
Manual
No
. F4117E987E V1.1