DINO 260XT
63
TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION
1.
Place the lift on an even surface with good carrying capacity. Drive the outriggers to their lowest
position (the minimum support width).
2.
Turn the boom to the side from the tow-bar and lower it on the ground.
3.
Put a weighed load of 215 kg on the platform (I).
4.
Lift the boom to as high as it goes and extend the telescope to its full length (maximum lifting
height).
5.
Lower the boom until the safety device stops the movement.
6.
Turn the boom round over 360°.
7.
Retract the telescope and lower the boom to the horizontal position.
8.
Extend the telescope until the safety limit switch RK4 stops the movement. Establish the standing
stability in this situation by turning the lift round over 360°.
9.
Carry out the same procedure with a platform load of 80 kg (II).
10.
Compare the outreach with the reach diagram. If necessary, readjust as instructed on page 52
"adjustment of the outreach and overload limit switches".
After the above mentioned test loadings (case I and case II) and the subsequent inspection have been
completed without finding any defects in the structure or stability of the lift, the lift may be used provided
that the reach and platform load restrictions on page 6 of this manual are observed.
The max. allowed platform load is 215 kg
-
in conjunction with the first, i.e. start-up inspection, the lift shall be subjected to a test loading with an
overload of 25% and after that the supporting structures shall be thoroughly inspected
-
in conjunction with every annual inspection the lift shall be subjected to a test run with maximum
permissible load and after that the supporting structures shall be thoroughly inspected
-
the first inspection shall be recorded in the start-up inspection protocol and the test-run shall be
recorded in the protocols for the annual and regular inspection
Summary of Contents for DINO 260XT
Page 2: ...DINO 260XT 2...
Page 3: ...DINO 260XT 3 OPERATING INSTRUCTIONS Valid from serial number 26121...
Page 6: ...DINO 260XT 6 REACH DIAGRAM...
Page 12: ...DINO 260XT 12...
Page 14: ...DINO 260XT 14 28L 28 28R 13 14 12 15 6 16 1 5 32 2 29 3 31 4A 10 34 7 33 8 9 11 4B...
Page 16: ...DINO 260XT 16 30A 26 25 23 20 36 18 22 30B 35 24 19 17 21...
Page 22: ...DINO 260XT 22 28L 28 28R 13 14 12 15 6 16 1 5 32 2 29 3 31 4A 10 34 7 33 8 9 11 4B...
Page 24: ...DINO 260XT 24 24 30A 26 25 23 20 36 18 19 22 17 21 30B 35...
Page 40: ...DINO 260XT 40 LUBRICATION PLAN...
Page 42: ...DINO 260XT 42 1...
Page 81: ...DINO 260XT 81...
Page 82: ...DINO 260XT 82 ELECTRIC DIAGRAM 26094...
Page 83: ...DINO 260XT 83...
Page 84: ...DINO 260XT 84...
Page 85: ...DINO 260XT 85...
Page 86: ...DINO 260XT 86...
Page 87: ...DINO 260XT 87...
Page 88: ...DINO 260XT 88...
Page 89: ...DINO 260XT 89...
Page 90: ...DINO 260XT 90...
Page 91: ...DINO 260XT 91...
Page 92: ...DINO 260XT 92...
Page 93: ...DINO 260XT 93...
Page 94: ...DINO 260XT 94...
Page 95: ...DINO 260XT 95...
Page 96: ...DINO 260XT 96...
Page 97: ......
Page 99: ...DINO 260XT 99 HYDRAULIC DIAGRAM BOOM SYSTEM 26102...
Page 100: ...DINO 260XT 100...
Page 101: ...DINO 260XT 101 Notes...