2. INSTALLATION
Page 5
© 2009 DH Instruments, a Fluke Company
2.
Installation
2.1
Unpacking And Inspection
2.1.1
Removing From Packaging
PPC4 is delivered in a corrugated container with suspension packaging; or in an optional
molded shipping case with custom foam inserts.
Remove the PPC4 and its accessories from the shipping container and remove each element
from its protective plastic bag.
2.1.2
Inspecting Contents
Check that all items are present and have no visible damage.
A PPC4 includes all items indicated in Table 2.
Table 2.
PPC4 Packing List
DESCRIPTION
PART #
1 ea.
PPC4 Pressure Controller/Calibrator
3336095
1 ea.
Calibration Report
3152121
1 ea.
Test Report
3126112
ACCESSORIES:
3305585
(3305597)
1 ea.
Operation and Maintenance Manual
3306047
1 ea.
Drivers Connector
3069838
1 ea.
USB Cable, 2 Meter, Shielded
1626219
1 ea.
Power Cord (7.5 ft.)
3133781
(3153005)
1 ea.
General Accessories CD
3139043
2 ea.
Bulkhead Retainer, ½ in. hex
3138166
2 ea.
M4 Split Lock Washer
3153914
2 ea.
M4 x 8 Screw, BHSC
3361394
2 ea.
M3 x 20 Screw, SHC
3133921
Summary of Contents for PPC4
Page 70: ...PPC4 OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 58 Notes...
Page 194: ...PPC4 OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 182 Notes...
Page 226: ...PPC4 OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 214 Notes...