G e t t i n g S t a r t e d
DataDirect Networks EF2800 FC RAID Storage System User Guide (V 1.0)
25
3.
Slide the module into the enclosure until the latches engage
automatically. The modules should be installed in rear bays 3 and
4 of the enclosure
(Figure 24)
. Note that the LH and RH modules
are installed in opposite orientations.
4.
Cam the module home by manually closing the latches
(Figure 25)
.
A click should be heard as the latches fully engage.
Storage Manager B
Storage Manager A
Figure 24. Module Locations
Figure 25. Installing a Controller I/O Module
Summary of Contents for EF2800
Page 1: ...EF2800 Fibre Channel RAID System User Guide ...
Page 2: ...V 1 0 EF2800 Fibre Channel RAID Storage System User Guide DataDirect Networks ...
Page 5: ...iv This page intentionally left blank ...
Page 13: ...This page intentionally left blank xii ...
Page 37: ...This page intentionally left blank 14 ...
Page 65: ...This page intentionally left blank 42 ...
Page 79: ...This page intentionally left blank 56 ...
Page 201: ...This page intentionally left blank 178 ...
Page 215: ...This page intentionally left blank 192 ...
Page 227: ...This page intentionally left blank 204 ...
Page 305: ...This page intentionally left blank 282 ...
Page 343: ...This page intentionally left blank 320 ...