G e t t i n g S t a r t e d
DataDirect Networks EF2800 FC RAID Storage System User Guide (V 1.0)
21
information on how to disengage the lock. Dummy modules may
be left in the slots.
3.
Carefully place the chassis on the two rail/support assemblies and
push it all the way into the rack.
If in doubt about correct orientation, the drive bays (at front)
should have their black drive connectors toward the bottom of
each bay.
4.
Secure the front of the chassis to the rack frame by inserting four
#10 screws (two on each side) through the holes in the flanges and
into the rack frame.
Using four #10 screws (two on each side), secure rear of chassis
to rail/support assemblies
(Figure 17)
.
5.
Replace the two power supplies in the back.
Insert one module into the left most bay and the other module into
the right most bay. Note the orientation of the modules
(Figure 19)
.
Swing the handle towards the module to cam the module home.
Make sure that the latches are engaged.
Figure 19. Power Supply Locations in Rear Panel
Summary of Contents for EF2800
Page 1: ...EF2800 Fibre Channel RAID System User Guide ...
Page 2: ...V 1 0 EF2800 Fibre Channel RAID Storage System User Guide DataDirect Networks ...
Page 5: ...iv This page intentionally left blank ...
Page 13: ...This page intentionally left blank xii ...
Page 37: ...This page intentionally left blank 14 ...
Page 65: ...This page intentionally left blank 42 ...
Page 79: ...This page intentionally left blank 56 ...
Page 201: ...This page intentionally left blank 178 ...
Page 215: ...This page intentionally left blank 192 ...
Page 227: ...This page intentionally left blank 204 ...
Page 305: ...This page intentionally left blank 282 ...
Page 343: ...This page intentionally left blank 320 ...