Test Operation (6/8 HP)
SiAF332111E
170
Part 5 Field Settings and Test Operation
6. Test Operation (6/8 HP)
6.1 Checks before Test Operation
Before carrying out a test operation, proceed as follows:
6.2 Checkpoints
To carry out a test operation, check the following:
Check that the temperature setting of the remote controller is at the lowest level in cooling
mode or use test mode.
Go through the following checklist:
Step
Action
1
Make sure the voltage at the primary side of the safety breaker is:
220-240 V ± 10% for 1-phase units;
380-415 V ± 10% for 3-phase units.
2
Fully open the liquid and the gas stop valve.
Checkpoints
Cautions or warnings
Are all units securely installed?
Dangerous for turning over during storm
Possible damage to pipe connections
Is the earth wire installed according to the applicable
local standard?
Dangerous if electric leakage occurs
Are all air inlets and outlets of the indoor and outdoor
units unobstructed?
Poor cooling
Does the drain flow out smoothly?
Water leakage
Is piping adequately heat-insulated?
Water leakage
Have the connections been checked for gas
leakage?
Poor cooling
Stop
Is the supply voltage conform to the specifications on
the name plate?
Incorrect operation
Are the cable sizes as specified and according to
local regulations?
Damage of cables
Are the remote controller signals received by the
unit?
No operation
Summary of Contents for VRV S RXQ4/5ARV1
Page 1: ...Service Manual Cooling Only 50 60 Hz RXQ4 5ARV1 RXMQ6ARV1 RXMQ8 10 12ARY1 SiAF332111E...
Page 369: ...SiAF332111E Wiring Diagrams Part 7 Appendix 363 RXMQ6ARV1 C 3D137051...
Page 370: ...Wiring Diagrams SiAF332111E 364 Part 7 Appendix RXMQ8ARY1 C 3D137060...
Page 371: ...SiAF332111E Wiring Diagrams Part 7 Appendix 365 RXMQ10 12ARY1 3D121610B...
Page 375: ...SiAF332111E Wiring Diagrams Part 7 Appendix 369 FXMQ40 50 63 80 100ARV1 3D127112 04 59...