ED34-862
Accessories
FXFQ-P
117
2
JC : 1P137894D
3
Closed
Procedure 3
Preparation Before Installation
Closed
2
Duct of
φ
150 or
φ
200
(field supplied)
Indoor unit
Closed
13 or 23
02
03
1
1-way branching,
3-direction blow
1-way branching and 2-way blow
or
2-way branching and 2-way blow
Sealing material
Tape
3
4
Closed
1
Branch duct chamber
Closed
Main body insulator 1
Stick with the end folded.
Main body insulator 2
Stick with the end folded.
Create a slit to the wiring hole using a cutter, etc..
Tape for fixing the sealing material
Mount so that the flat face becomes
the top plate side of the indoor unit.
Air outlet 2
Air outlet 3
Branch duct chamber
Indoor unit main body
Procedure 2
Remove the
release paper.
Closed
Release paper
Wrap with tape to prevent
an air leak.
Mounting screw, 10 pieces
(M4×16)
Closed
Closed
4
Cut off.
Indoor unit
main body
Stick with the left sides of
the main body insulators
1 , 2 , and 3 aligned.
Drain side
Procedure 1
a) Extreme bending
b) Multiple bending
c) Reduction of connecting
duct diameter
<Sealing material preparation>
Duct Connection <<Duct: >>
<Mounting to air outlet>
Piping side
3) Mount the branch duct chamber. Figure 4
Figure 4
(3) Stick the main body insulator to the indoor unit. (The figure is an example of the face 1 side) Figure 5
Be sure to stick the main body insulator from the top of the branch duct
chamber flange (sheet metal section). Otherwise, condensation may occur.
Figure 5
Main body insulator 3
Stick with the end folded.
Main body insulator 3
KDJP55H80 ... Nominal diameter of
φ
150
KDJP55H160 ... Nominal diameter of
φ
200
1) Connect the duct to the outside of the branch duct chamber. Figure 6
• After the connection, wrap the connection area with tape (field supplied)
to prevent an air leak.
• Apply insulation for all the ducts.
2) Do not perform duct manipulation described below.
Figure 6
1. Beware that, in accordance with the local law, there may be cases where the use of a nonflammable duct is compulsory.
2. When a duct goes through fire protection areas, including a fire proof structure, beware that, in accordance with the local law, it may
be required to establish a damper or to build a structure that is not detrimental to fire protection.
3. When penetrating a wooden construction wall with a metal duct, apply electrical insulation to the duct and wall.
Mounting of Sealing Material to Indoor Unit <<With the sealing material supplied in this kit, blocking of two openings can be performed.>>
•
For the block position, refer to , then determine the position. Always block the branch duct mounting surface.
Air outlet 1
Air outlet 3
3-way blow
2-way blow
3
2
1
4
3
2
1
4
3
2
1
4
3
2
1
4
3
2
1
4
(1) Matching the longitudinal air outlets numbered from 1 to 4 to be blocked, prepare the sealing material and tape for fixing the sealing material.
• Cut both the sealing material and tape for fixing the sealing material along the perforation (dotted line).
• Stick the sealing material to the tape for fixing the sealing material.
(Stick so that the sealing material is at the centre of the tape for fixing the sealing material.)
Example) When blocking air outlet 2 or 3
(2) Stick the sealing material that was prepared in (1) to
the air outlet of the indoor unit main body.
Air outlet 1
Precautions
The sealing material has a directional
property. Be sure to stick the sealing
material to the tape for fixing the sealing
material so that the printed number of the
outlet to be blocked becomes visible.
2
·
3
Stick the sealing material so that
it is at the centre of the tape for
fixing the sealing material.
•
When blocking the air outlet 1 , sealing material preparation is not necessary.
Mounting of Decoration Panel
For safety, be sure to shut off power supply before starting the decoration
panel mounting operation and connecting the connectors for swinging.
Refer to the installation manual attached to the decoration panel.
After mounting the decoration panel, check that no gap is present between the decoration panel and the unit's main body.
Field Setting
•
When mounting the branch duct chamber, setting the indoor unit main body is required.
After all the engineering work is completed, perform setting together with field setting of
the indoor unit.
Using the field setting mode on the remote control, switch to the setting position number
shown in the table to the right. For the field setting mode, refer to "How to perform field
setting" attached to the remote control.
Branch blow pattern
Mode number
Setting switch number
Setting position number