![background image](http://html1.mh-extra.com/html/daikin/rzq100b7w1b/rzq100b7w1b_service-manual_2460009020.webp)
Introduction
ESIE05-03
x
3
1
4
5
Vacuum pump with
check valve
P
Specifications
•
Discharge speed
z
Maximum degree of vacuum
50 l/min (50Hz)
–100.7 kpa ( 5 torr – 755 mmHg)
60 l/min (60Hz)
•
Suction port UNF7/16-20(1/4 Flare)
UNF1/2-20(5/16 Flare) with adaptor
P
Differences
•
Equipped with function to prevent reverse oil flow
•
Previous vacuum pump can be used by installing adaptor.
Leak tester
P
Specifications
•
Hydrogen detecting type, etc.
•
Applicable refrigerants
R410A, R407C, R404A, R507A, R134a, etc.
P
Differences
•
Previous testers detected chlorine. Since HFCs do not contain chlorine, new tester detects
hydrogen.
Refrigerant oil (Air
compal)
P
Specifications
•
Contains synthetic oil, therefore it can be used for piping work of every refrigerant cycle.
•
Offers high rust resistance and stability over long period of time.
P
Differences
•
Can be used for R410A and R22 units.
Vacuum pump adaptor
(Reverse flow preventive
vacuum adaptor)
ESIE05-03.book Page x Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...