Field settings
ESIE05-03
4–10
Part 4 – Commissioning and Test Run
3
1
4
5
2.2
How to Change the Field Settings with the Wired Remote Controller
Installation
conditions
The field settings have to be changed with the remote controller according to the installation
conditions.
Wired remote
controller
(BRC1D527)
The illustration below shows the wired remote controller.
Components
The table below contains the components of the wired remote controller.
1
2
9
3
25
22
11
10
37
35
27
26
12
14
17
34
24
5
20
21
18
16
13
15
19
32
31
30
29
28
4
36
33
8
23
7
6
No. Component
No. Component
1
ON/OFF button
20
Air flow direction icon
2
Operation lamp
21
Not available
3
Operation mode icon
22
Fan speed icon
4
Ventilation mode icon
23
Defrost/hotstart mode icon
5
Ventilation icon
24
Air filter cleaning time icon
6
Air cleaning icon
25
Element cleaning time icon
7
Leave home icon
26
Ventilation mode button
8
External control icon
27
Ventilation amount button
9
Change-over under centralised control icon 28
Inspection/test operation button
10
Day of the week indicator
29
Programming button
11
Clock display
30
Schedule timer button
12
Maximum set temperature
31
Time adjust button
13
Minimum set temperature
32
Temperature adjust buttons
14
Schedule timer icon
33
Operation change/ button
15
Action icons
34
Setpoint/limit button
16
Off icon
35
Fan speed button
17
Inspection required
36
Air flow direction adjust button
18
Set temperature display
37
Air filter cleaning time icon reset
19
Setting
ESIE05-03.book Page 10 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...