ESIE05-03
Introduction
xi
3
4
5
Gauge manifold for
R410A
P
Specifications
•
High pressure gauge
- 0.1 to 5.3 MPa (-76 cmHg to 53 kg/cm
2
)
•
Low pressure gauge
- 0.1 to 3.8 MPa (-76 cmHg to 38 kg/cm
2
)
•
1/4"
→
5/16" (2min
→
2.5min)
•
No oil is used in pressure test of gauges.
→
For prevention of contamination
•
Temperature scale indicates the relationship between pressure and temperature in gas saturated
state.
P
Differences
•
Change in pressure
•
Change in service port diameter
Charge hose for
R410A
P
Specifications
•
Working pressure 5.08 MPa (51.8 kg/cm
2
)
•
Rupture pressure 25.4 MPa (259 kg/cm
2
)
•
Available with and without hand-operate valve that prevents refrigerant from outflow.
P
Differences
•
Pressure proof hose
•
Change in service port diameter
•
Use of nylon coated material for HFC resistance
(Hose with ball valve)
ESIE05-03.book Page xi Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...