![background image](http://html1.mh-extra.com/html/daikin/rzq100b7w1b/rzq100b7w1b_service-manual_2460009138.webp)
Outdoor Unit Functional Concept
ESIE05-03
2–54
Part 2 – Functional Description
3
1
2
4
5
3.3.9
Inverter Cooling Fin Temperature Control
Outline
This control will restrict the compressor upper limit frequency in order to protect the electronic
components in the switch box from overheating (L4-error activation).
By lowering the compressor frequency, the current drawn by the compressor will be reduced and as
a result the temperature inside the switch box will drop.
Flow chart
Parameters
Fin Temperature
≤
B°C lasts for 2 minutes
Normal operation
Compressor frequency
–1 step/2 min
Compressor frequency
–1 step/6 sec
Inverter fin temperature
≥
A°C
Inverter upper limit frequency
= Maximum frequency
RZQ71B8V3B
RZQ100~125B8V3B
RZQ100~140B7W1B
A°C
82°C
74°C
71°C
B°C
79°C
71°C
68°C
ESIE05-03.book Page 54 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...