![background image](http://html1.mh-extra.com/html/daikin/rzq100b7w1b/rzq100b7w1b_service-manual_2460009054.webp)
Functional Diagrams
ESIE05-03
1–32
Part 1 – System Outline
3
11
4
5
Allowable pipe
length and heigth
difference
When re-using existing piping, refer to below table for allowable piping length and heigth difference
(figures in brackets are equivalent lengths).
Model RZQ
Liquid pipe
size
71
100
125 & 140
Maximum allowable piping length (*)
Pair: L1
Twin and triple: L1 + L2
Double twin: L1 + L2 + L4
size-down
10 m (15 m)
standard
50 m (70 m)
50 m (70 m)
50 m (70 m)
size-up
25 m (35 m)
35 m (45 m)
35 m (45 m)
Maximum total one-way piping length
Twin: L1 + L2 + L3
––
50 m
50 m
50 m
Triple: L1 + L2 + L3 + L4
––
Double twin:
L1 + L2 + L3 + L4 + L5 + L6 + L7
––
Maximum branch piping length
Twin: L2
Double twin: L2 + L4
––
20 m
Maximum difference between branch lengths
Twin: L2 - L3
––
10 m
10 m
10 m
Triple: L2 - L4
––
Double twin: L2 - L3, L4 - L5,
L6 - L7, (L2 + L4) - (L3 + L7)
––
Maximum heigth between indoor and outdoor
All: H1
––
30 m
Maximum heigth between indoors
Twin, triple and double twin: H2
––
0.5 m
Chargeless length
All:
L1 + L2 + L3 + L4 + L5 + L6 + L7
size-down
10 m
standard
30 m
size-up
15 m
ESIE05-03.book Page 32 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...