![background image](http://html1.mh-extra.com/html/daikin/rzq100b7w1b/rzq100b7w1b_service-manual_2460009031.webp)
ESIE05-03
General Outline: Outdoor Units
Part 1 – System Outline
1–9
3
1
4
5
Stacked
The illustration below shows the required installation and service space (mm). The values in brackets
are for the 100~140 class.
P
Do not stack more than one unit.
P
± 100 mm is required as the dimension for laying the upper outdoor unit’s drain pipe.
P
Get the portion A sealed so that air from the outlet does not bypass.
Multiple rows
The illustration below shows the required installation and service space (mm). The values in brackets
are for the 100~140 class.
Relation of dimensions of H, A and L are shown in the table below.
Obstacles exist in front of the outlet side
Obstacles exist in front of the air inlet
L
A
L
≤
H
0 < L
≤
1/2H
150 (250)
1/2H < L
200 (300)
H < L
installation impossible
Installation of one unit per row
Installing multiple units (2 units or more)
in lateral connection per row
ESIE05-03.book Page 9 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...