![background image](http://html1.mh-extra.com/html/daikin/rzq100b7w1b/rzq100b7w1b_service-manual_2460009212.webp)
Error Codes: Outdoor Units
ESIE05-03
3–64
Part 3 – Troubleshooting
3
1
3
4
5
Troubleshooting
To troubleshoot, proceed as follows:
Caution
Be sure to turn off power switch before connecting or disconnecting the connector, or parts damage
may occur.
· Turn the power OFF and back
ON after 2 or 3 minutes.
· Check the continuity of the
LPS for control and safety.
Open the stop valve.
Replace LPS without continuity.
Fault in refrigerant piping.
Replace the outdoor unit PC board.
(A1P)
Is the stop
valve open?
Does
this LPS have
continuity?
Check the
installation conditions.
Yes
Is the
LPS correctly
connected to the
outdoor unit
PCB?
Yes
Yes
OK
No
Connect correctly.
No
No
No
Low pressure is
abnormally
low.
Check 5.8
ESIE05-03.book Page 64 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...