4-way Valve Control
Purpose
The purpose of the 4-way valve control is to control how the superheated refrigerant passes through
the 4-way valve. The 4-way valve control carries out the changeover switching of the 4-way valve. This
changeover switching is only carried out during operation, because a certain pressure difference is
required to move the internal cylinder.
Method
The table below describes the 4-way valve control operation.
Time chart
The time chart below illustrates the 4-way valve control.
When...
Then the 4-way valve connects the outlet of the compressor with...
Cooling
Outdoor heat exchanger
Heating
Indoor heat exchanger
In...
The 4-way valve is...
Heating, except for defrosting
ON
P
Cooling
P
Dry keep
P
Defrosting
OFF
Compressor
4-way valve
Defrosting
Unit mode
ON
OFF
OFF
ON
OFF
ON
Heating
Cooling/Dry
ESIE05-03.book Page 16 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...