Pre-Test Run Checks
ESIE05-03
4–4
Part 4 – Commissioning and Test Run
3
1
4
5
1.2
Test Run Checks
Checks before test
run
Before carrying out a test run, proceed as follows:
Test run checks
To carry out a test run, check the following:
P
Check that the temperature setting of the remote controller is at the lowest level in cooling mode
or use test mode.
P
Go through the following checklist:
Step
Action
1
Make sure the voltage at the primary side of the safety breaker is:
P
230 V ± 10% for 1-phase units
P
400 V ± 10% for 3-phase units
2
Fully open the liquid and the gas stop valve.
Checkpoints
Cautions or warnings
Are all units securely installed?
P
Dangerous for turning over during
storm.
P
Possible damage to pipe
connections.
Is the earth wire installed according to the applicable
local standard?
Dangerous if electric leakage occurs.
Are all air inlets and outlets of the indoor and outdoor
units unobstructed?
P
Poor cooling.
P
Poor heating.
Does the drain flow out smoothly?
Water leakage.
Is piping adequately heat-insulated?
Water leakage.
Have the connections been checked for gas leakage?
P
Poor cooling.
P
Poor heating.
P
Stop.
Is the supply voltage conform to the specifications on
the name plate?
Incorrect operation.
Are the cable sizes as specified and according to local
regulations?
Damage of cables.
Are the remote controller signals received by the unit?
No operation.
ESIE05-03.book Page 4 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...