ESIE05-03
Additional Checks for Troubleshooting
Part 3 – Troubleshooting
3–103
3
3
4
5
1
Part 3
5
Additional Checks for Troubleshooting
5.1
What Is in This Chapter?
Introduction
This chapter explains how you must check the units to carry out troubleshooting correctly.
Overview
This chapter contains the following topics:
Topic
See page
5.2–Outdoor unit: Checking the Installation Condition
3–104
5.3–Outdoor Unit: Checking the Expansion Valve
3–105
5.4–Checking the Thermistors
3–106
5.5–Resistance Conversion Table (Ambient, Coil, Fin)
3–107
5.6–R3T: Resistance Conversion Table (Discharge Pipe Sensor)
3–108
5.7–Evaluation of Abnormal High Pressure
3–109
5.8–Evaluation of Abnormal Low Pressure
3–110
5.9–Checks
3–111
ESIE05-03.book Page 103 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...