ESIE05-03
Field settings
Part 4 – Commissioning and Test Run
4–33
3
4
5
1
Capacity
When "low humidity application" is selected. Field setting 16(26)-2-03:
Capacity
When "low humidity appli freeze up operation prevention" is selected. Field setting
16(26)-2-04:
Note:
P
Operation range on indoor side expanded from minimum 12°CWB to 11°CWB when using LH
setting.
P
Do not use a setpoint below 20°C to avoid operation out of the indoor operation range (11°CWB).
P
Be sure to set the indoor fan to high speed.
Outdoor
Temp.
(°C-DB)
Indoor Temp. (°C-WB)
11
14
16
18
19
20
22
24
Capacity (% of standard point)
-15
0.62
0.76
0.86
0.95
1.00
1.02
1.07
1.11
-10
0.62
0.76
0.86
0.95
1.00
1.02
1.07
1.11
-5
0.62
0.81
0.91
1.01
1.06
1.16
1.21
1.26
0
0.62
0.81
0.91
1.01
1.06
1.16
1.21
1.26
5
0.62
0.81
0.91
1.01
1.06
1.16
1.21
1.26
10
0.62
0.81
0.91
1.01
1.06
1.16
1.21
1.26
15
0.62
0.81
0.91
1.01
1.12
1.14
1.19
1.24
20
0.62
0.81
0.91
1.07
1.10
1.12
1.16
1.21
25
0.62
0.81
0.91
1.05
1.07
1.09
1.13
1.18
30
0.61
0.81
0.91
1.01
1.04
1.06
1.10
1.14
35
0.61
0.81
0.94
0.98
1.00
1.02
1.06
1.11
40
0.61
0.81
0.90
0.94
0.96
0.98
1.02
1.06
Outdoor
Temp.
(°C-DB)
Indoor Temp. (°C-WB)
11
14
16
18
19
20
22
24
Capacity (% of standard point)
-15
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.26
-10
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.26
-5
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.26
0
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.26
5
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.26
10
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.26
15
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.24
20
0.51
0.68
0.78
0.95
1.01
1.06
1.16
1.21
25
0.51
0.68
0.78
0.95
1.00
1.06
1.13
1.18
30
0.51
0.68
0.78
0.95
1.00
1.05
1.10
1.14
35
0.51
0.68
0.78
0.95
1.00
1.02
1.06
1.11
40
0.51
0.67
0.78
0.94
0.96
0.98
1.02
1.06
ESIE05-03.book Page 33 Wednesday, April 6, 2005 4:09 PM
Summary of Contents for RZQ100B7W1B
Page 1: ...Service Manual ESIE05 03 RZQ71 125B8V3B RZQ100 140B7W1B Sky Air Inverter R 410A B series...
Page 2: ......
Page 10: ...ESIE05 03 viii Table of Contents 3 1 4 5...
Page 24: ...ESIE05 03 1 2 Part 1 System Outline 3 1 1 5...
Page 32: ...General Outline Outdoor Units ESIE05 03 1 10 Part 1 System Outline 3 1 1 4 5...
Page 42: ...Specifications ESIE05 03 1 20 Part 1 System Outline 3 1 1 4 5...
Page 56: ...Functional Diagrams ESIE05 03 1 34 Part 1 System Outline 3 1 1 4 5...
Page 58: ...ESIE05 03 1 36 Part 1 System Outline...
Page 70: ...Wiring Diagrams ESIE05 03 1 48 Part 1 System Outline 3 1 1 4 5...
Page 84: ...PCB Layout ESIE05 03 1 62 Part 1 System Outline 3 1 1 4 5...
Page 86: ...ESIE05 03 2 2 Part 2 Functional Description 3 1 2 5...
Page 110: ...General Functionality ESIE05 03 2 26 Part 2 Functional Description 3 1 2 4 5...
Page 150: ...ESIE05 03 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 188: ...Troubleshooting ESIE05 03 3 40 Part 3 Troubleshooting 3 1 3 4 5...
Page 264: ...Additional Checks for Troubleshooting ESIE05 03 3 116 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...ESIE05 03 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 306: ...ESIE05 03 5 2 Part 5 Disassembly and Maintenance 3 1 5...