![Daikin RXL25G2V1B Service Manual Download Page 238](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970238.webp)
SiENBE04-925_A
Outdoor Unit - RXL25G2V1B
Removal Procedure
223
7
Remove the 8 screws in
total to remove the
PCB.
8
Lift up the back side
slightly and unfasten
the hooks of the front.
When reassembling, make
sure that the hooks of the
electrical box are placed on
the PCB.
9
Lift up the PCB.
Step
Procedure
Points
(R8163)
(R8164)
(R8166)
Hooks
(R8167)
SIENBE04-925_A_FRONT.pdf 238
24/02/2011 13:54:14
Summary of Contents for RXL25G2V1B
Page 8: ...SiENBE04 925_A vi Table of Contents ...
Page 14: ...Introduction SiENBE04 925_A xii ...
Page 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Page 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Page 20: ...Specifications SiENBE04 925_A 6 Specifications ...