![Daikin RXL25G2V1B Service Manual Download Page 153](http://html.mh-extra.com/html/daikin/rxl25g2v1b/rxl25g2v1b_service-manual_501970153.webp)
Indoor Unit
SiENBE04-925_A
138
Removal Procedure
1.5
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
The figure shows the
connections of wire
harnesses.
Preparation
Remove the front grille
according to the “Removal
of Front Grille”.
2
Remove the screw of
the wire fixture.
3
Remove the screws on
the terminal board to
disconnect the
connecting wires.
4
Disconnect the
connector for fan motor
[S1].
(R7931)
Electrical box
(R7932)
Wire
fixture
(R7933)
Terminal
board
Connecting
wires
(R7934)
[S1]
SIENBE04-925_A_FRONT.pdf 153
24/02/2011 13:53:59
Summary of Contents for RXL25G2V1B
Page 8: ...SiENBE04 925_A vi Table of Contents ...
Page 14: ...Introduction SiENBE04 925_A xii ...
Page 15: ...SiENBE04 925_A List of Functions 1 Part 1 List of Functions 1 Functions 2 ...
Page 17: ...SiENBE04 925_A Specifications 3 Part 2 Specifications 1 Specifications 4 ...
Page 20: ...Specifications SiENBE04 925_A 6 Specifications ...